Mining: Guayaquil Project

Nowadays, the most advanced one is the Vereda Guayaquil Mining project, in the municipality of Pensilvania, in the state of Caldas. It is a relevant mining project that pivots around the gold exploration and exploitation, which, in addition to creating wealth in the area, bets on responsible mining, with the nearby population as well as the environment.

100%
Soils study

This report includes the study of soils for the foundations of an aerial cable of three stations, a beneficiation plant and the access road to the Guayaquil mine, which is located in the center of the department of Caldas, approximately 5 km from the border with the department of Nariño in the village of Guayaquil. Taking as reference the results of the investigation of the subsoil (geotechnical exploration and determination of resistance parameters), the procedures, analysis and geotechnical recommendations for the design of the infrastructure described above will be captured.

  Read more about Soils study

100%
Architecture
100%
General Distribution
100%
Processing Plant
100%
Laboratory
0%
Campsite
80%
Laboratory
100%
Conceptual and Basic Design
80%
Disc Sprayer (8 inches)
80%
Jaw Crusher 3x5
80%
Gravimetric Concentration Table Wilfley
80%
Laboratory Flotation Cell
35%
Laboratory Container
40%
Electrical network
100%
Electric design
100%
Provisional electric power
0%
Main circuit between Pennsylvania and Guayaquil
0%
2MVA Substation
50%
Plant electrical networks
0%
Lighting systems and cells + cells for tools
0%
Mine electrical networks
50%
Machinery and vehicles for construction and displacement
100%
Pick Up Vans: 2
100%
Dump Truck
100%
Crawler Backhoe
0%
Tires Tractor Backhoe
0%
Ambulance
0%
Additional Van
0%
Carrier Motorcycle
10%
Processing Plant
100%
Conceptual and Basic Design
100%
Engineering Detail (3D Modeling)
65%
Solid Pump MBS 75-75
0%
Equipments Cost
0%
Civil Work
0%
Structure and Top Cover (industrial unit)
0%
Crane Bridge
0%
Lateral Acoustic Enclosure
0%
Support Structures and Walkways
0%
Assembly

The engineering detail (3D Modeling) is 100% completed. 80% of the work development. Construction missing. This has already been hired. Waiting for the financial resources to start. Work development has already reached 66%. It is necessary to have before the "Soils Study" and the "Structural Calculations" (already carried out)

  Read more about Processing Plant

33%
System for hydraulic filling (with tanks)
0%
System to Send Dirty Water from the Mine to the Processing Plant
0%
Engineering Detail
0%
Pumping Station of "Colombia" Mine Entry
0%
Pipeline between "Colombia" Mine Entry and the Plant
0%
Pipeline between Panels to Fill and the "Colombia" Mine Entry
0%
Mechanical and electrical repair shop, including the material storage yard
0%
Sulfide patio
0%
Parking lot
60%
Construction of the entrance road to the processing plant and interiors
80%
Adaptation of roads to the pithead
0%
Training room
0%
Parking of heavy machinery, maintenance and washing
80%
Offices
0%
Lodgings and bathrooms (two floors)
0%
Two small canteens (Mine and Plant)
0%
Heliport
100%
Munitions dump (2 rooms)
100%
Conceptual and Basic Design
100%
Architecture
100%
Construction
0%
Fuel storage (2 tanks)
0%
Lubricants and oils storage (2 tanks)
0%
Floor scale for dump trucks
66%
Aerial cable
100%
Conceptual and Basic Design
100%
Engineering Detail
0%
Mechanical Construction and Assembly
0%
Electrical Construction and Assembly
0%
Civil Work
30%
Mineral loading station in the pithead
100%
Switch and make rails
0%
Civil work
0%
Metal unload hopper in the pithead 1
0%
Metal unload hopper in the pithead 2
0%
Supplies loading platform
60%
Materials and Tools for the Mine
60%
Make Rails and Arches
90%
Drills
100%
Metal Meshes
0%
Attachment Bolts
66%
Equipment for the Mine
100%
Pneumatic drilling machines: 4
90%
Wagons: 5
90%
Pneumatic shovel: 1
100%
Locomotive: 1
0%
Winch with rake
0%
Drilling machine for vein exploration
0%
Total station
30%
Ventilation system
20%
6-inch Ventilation Duct. 300 Meters
90%
10 hp Fan
90%
Compressed air
100%
Compressor
100%
Electric Variator and Control Consoles
100%
Support Platform
90%
Piping Line
90%
Rubber-Canvas Hose 1" 100 meters
95%
Lungs (Air Storage)
0%
Explosives

E-commerce

Pending to start the extraction of gold in the Guayaquil mining project

The e-commerce of InnovaMinex is based on the sale of gold online, with an excellent market price and exclusive benefits for the holders of our MINX cryptocurrency.

 

ATMs

Pending to start the extraction of gold in the Guayaquil mining project

Through the InnovaMinex ATMs you can buy and sell bitcoins. Its graphical interface, focused on usability, is the result of the studyof the reactions of hundreds of consumers to the existing equipmentsin the marketplace. Come up to the nearest ATM and try it out!

 

 

Other mining projects

The VIZCAYA, BOLÍVAR 2, ANTIOQUIA 3, MINEX 7, MINEX 12 and TOLIMA projects total more than 2,500 Has. to be explored. In the next 5 years, the rehabilitation and construction of the guides will start, as well as the beneficiation plant for the extraction of minerals.

5%
Vizcaya
0%
Environmental Impact Study
0%
Environmental Management Plan
0%
Closure Plan
0%
Works Programme
0%
Polymetallic Nodules Survey
0%
Plant Details and Accessory Elements Engineering
0%
Soils Study and Structural Calculation
0%
Warehouse and Civil Infrastructure Designs
0%
Equipment Purchase and Construction
5%
Bolívar 2
0%
Environmental Impact Study
0%
Environmental Management Plan
0%
Closure Plan
0%
Works Programme
0%
Polymetallic Nodules Survey
0%
Plant Details and Accessory Elements Engineering
0%
Soils Study and Structural Calculation
0%
Warehouse and Civil Infrastructure Designs
0%
Equipment Purchase and Construction
5%
Antioquia 3
0%
Environmental Impact Study
0%
Environmental Management Plan
0%
Closure Plan
0%
Works Programme
0%
Polymetallic Nodules Survey
0%
Plant Details and Accessory Elements Engineering
0%
Soils Study and Structural Calculation
0%
Warehouse and Civil Infrastructure Designs
0%
Equipment Purchase and Construction
5%
Minex 7
0%
Environmental Impact Study
0%
Environmental Management Plan
0%
Closure Plan
0%
Works Programme
0%
Polymetallic Nodules Survey
0%
Plant Details and Accessory Elements Engineering
0%
Soils Study and Structural Calculation
0%
Warehouse and Civil Infrastructure Designs
0%
Equipment Purchase and Construction
5%
Minex 12
0%
Environmental Impact Study
0%
Environmental Management Plan
0%
Closure Plan
0%
Works Programme
0%
Polymetallic Nodules Survey
0%
Plant Details and Accessory Elements Engineering
0%
Soils Study and Structural Calculation
0%
Warehouse and Civil Infrastructure Designs
0%
Equipment Purchase and Construction
5%
Tolima
0%
Environmental Impact Study
0%
Environmental Management Plan
0%
Closure Plan
0%
Works Programme
0%
Polymetallic Nodules Survey
0%
Plant Details and Accessory Elements Engineering
0%
Soils Study and Structural Calculation
0%
Warehouse and Civil Infrastructure Designs
0%
Equipment Purchase and Construction