Guayaquil Project: Processing Plant

The engineering detail (3D Modeling) is 100% completed. 80% of the work development. Construction missing. This has already been hired. Waiting for the financial resources to start. Work development has already reached 66%. It is necessary to have before the "Soils Study" and the "Structural Calculations" (already carried out)