3D modelling of the detailed engineering is 100% complete. In the development of the works, 66% of the work has been completed. The “Soil Survey” and the “Structural Calculations” have already been prepared.
Requirements for the beneficiation plant or processing plant:
Conceptual and Basic Design
Detailed Engineering
MBS Solids Pump
Equipment
Civil Works Concrete Foundations
Metal Structure plus Roof (hall or warehouse)
Bridge Crane
Support Structures and Walkways
Lateral Acoustic Enclosure
Erection (one year with bridge crane)