Final work on the Aerial Cable

This post is also available in: Spanish

We are entering the final stretch of the construction of the aerial cable or cargo cableway; at this moment we are carrying out the following tasks:

  • Installation of the elevation system for the wagons
  • Installation of the load band
  • Tensioning the cables that support the cargo gondolas.
  • We started with the construction of the control room where all the controls of the transport system will be installed
Minera Pensilvania Gold Mineral gm Labores finales ne la construccion del cable aereo

At InnovaMinex, Minera Pensilvania Gold & Mineral and MinexCorp we continue advancing rapidly with the assembly of all the infrastructure to start the exploitation stage very soon.

At InnovaMinex, Minera Pensilvania Gold & Mineral and MinexCorp we continue advancing rapidly with the assembly of all the infrastructure to start the exploitation stage very soon.

Upgrade 10/02/2021

photo 2021 02 10 11.54.04 1
photo 2021 02 10 11.54.12 3
photo 2021 02 10 11.56.47 1