Processing plant

3D modelling of the detailed engineering is 100% complete. In the development of the works, 66% of the work has been completed. The “Soil Survey” and the “Structural Calculations” have already been prepared.

Requirements for the beneficiation plant or processing plant:

Conceptual and Basic Design

Detailed Engineering

MBS Solids Pump

Equipment

Civil Works Concrete Foundations

Metal Structure plus Roof (hall or warehouse)

Bridge Crane

Support Structures and Walkways

Lateral Acoustic Enclosure

Erection (one year with bridge crane)

Leave a Reply
You May Also Like